> Impact crusher works in stone production line

Impact crusher works in stone production line

Stone production line impact crusher works mainly about five points :

(1) Easy flexible adjustment of the feed size , a wide range of adjustment
Impact crusher through a variety of ways to adjust the granularity of the material , such as adjusting the rotor speed , and adjust the gap of the back plate and the grinding chamber . Gap adjustment can be mechanical or hydraulic adjustment, hydraulic adjustment system can be easily adopted by the local operation buttons or remote controls system to complete the gap adjustment . Hammer crusher to adjust the granularity of the material can only be implemented by replacing the bottom of the sieve .

(2) Can effectively handle large moisture content of materials, to prevent clogging of the crusher
In dealing with excessive moisture content of materials , impact crusher feed chute and back plate can be equipped with a heating device to prevent the bonding of materials . Impact Crusher is no need with the bottom of the sieve can effectively prevent the clogging . The hammer crusher can not use the heating mode to prevent the bonding of materials , and shall be equipped with the bottom of the sieve plate , increasing the possibility of clogging .

(3) The impact crusher is not only suitable for soft materials and for a very large hardness of materials .
Impact crusher board hammer with a mechanical clamping structure is firmly fixed on the rotor , when the great moment of inertia with the rotor rotates . Hammer crusher ( hammer was overhanging ) , impact crusher rotor has a greater momentum to adapt to broken hard materials , while the lower energy consumption .

(4) Spare parts easy to replace , and a corresponding reduction in maintenance costs
The impact crusher rotor is installed only six board hammer, the use of special tools can be easily board hammer replacement, the replacement of a board hammer just a time shift . The bottom of the grinding chamber grinding stick replacement only takes tens of minutes , greatly reducing the time and cost of repair and maintenance . Hammer crusher hammer up to more than 100 , the replacement of a hammer to spend a lot of time and manpower , repair and maintenance costs higher . The bottom of the sieve replacement too much trouble.

(5) Wearing parts wear and tear than the hammer crusher metal utilization
The impact crusher board hammer wear occurs only side Looking materials . When the normal rotor speed , the feed will fall to the board hammer surface ( of attack ) , the back and side of the board hammer is not to be worn. Even if it is to Looking material this side of the wear rarely . And the bottom of the grinding rod is also very easy to replace. Counterattack crusher board hammer the metal utilization can be as high as 45% -48 % . Hammer crusher hammer was overhanging the wear on the front and rear and side , hammer metal utilization ratio is only about 25% relative to the board hammer, hammer wear .And the rotor body itself may also be worn. The hammer crusher at the bottom of sieve wear serious , the grille to replace all , and replace the sieve is also more complicated .
Thank you for your interest in YiFan. Please use any of the methods below to get in touch with us.
Add: The Middle of Zhengyuan Road, Xingyang Eastern Development Zone.
zip:450100
E-mail:yifanseo@yfmac.com
MSN On line: yifancrusher@yahoo.cn
ICQ: 639607958 QQ: 2502761202
Tel: +86-371-64628852 Fax: +86-371-64628872
The article by Sand Maker product line,sand plants,Sand Maker plant Yifan Machinery Editor: http://www.sandplant.net/ , please indicate the source , little effort , thank you .

© 2010 YiFan Machinery